Main parking lot access point rerouted this week
Posted on: Nov 7, 2022Please be advised the main parking lot access point from 112 ave via 73 street will be blocked for construction during Reading Week, November 6-12.
Traffic from the north (112 ave) will need to reroute through the Ralph King Athletic Centre and North Faculty lots or through 71 street from the south east.