Campus Access Disruption
Posted on: Oct 24, 2022Please be advised the main parking lot access point from 112 Ave via 73 street will be blocked for construction during the week of November 6-12. (Reading Week) Traffic from the north,(112 ave) will reroute through the Ralph King Athletic Centre and North Faculty lots or through 71 street from the south-east.